Boulevard Alley Bridge

  • Location

    Al-Riyadh

  • Project scope

    All Concrete , steel and covering works

  • Project duration

    10 days.

our clients

Project Overview

A four hundred meter length and fifteen meter width bridge in the main lack with main and secondary beams carrying concrete slab on a metal deck.